![]() G/As are generated when the following are required. ![]() They may also be spread across several different drawings. Depending on the complexity of the object, G/As are likely to require a number of different projections, such as sections, plans and elevations. ![]() General arrangement (G/A) drawings are critical for viewing the overall configuration of a mechanical unit (e.g building, skid, plant, etc.) They also display an overview of key structural elements of a piece of equipment, structure, or assembly. In this article you will learn the process for generating a G/A, how to read a G/A, and using a G/A for document generation and equipment verification. General Arrangement (G/A) drawings present the overall composition of a plant, skid, building, or piece of equipment.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |